Sinopec Sixth Construction

← All Projects

Sinopec Sixth Construction

Imported reference project. Images and source details do not establish GALAXY ownership, supply scope or current project status; these remain unverified.

Sinopec Sixth Construction: Cracking Furnaces #2, #5, and #6 Project

Project Details

Reference project imported from the original site. GALAXY attribution, project data and supply scope await verification. Units have not been converted or inferred.

Steel quantity stated in source

6,000 tons steel

Dimensions — units awaiting confirmation

77.7 x 40.7

Request Similar Quote

Ready to Review Your Structure?

Send your conceptual drawings, building dimensions, and local load specifications. Our engineering team typically delivers a preliminary technical review, connection scheme, and initial budget reference within 48 hours.

Request a Quote →